Pool Renovation & Resurfacing in a Bali villa

A pool is the centrepiece of most Bali villas and the first thing rental guests photograph — so a stained, leaking or dated pool drags down the whole property. The two problems we see most are surface failure (chalky, rough or discoloured plaster and lifting waterline tiles) and slow leaks that show up as a pool that drops faster than evaporation explains and a water bill nobody can account for. We fix both, from a cosmetic resurface to a full structural and plant overhaul.

What Pool Renovation Covers

Resurfacing

New plaster, pebble or tiled interior finish over a properly prepared shell — smooth, sealed and colour-matched to the look you want.

Tiling & Coping

Waterline tiles, full mosaic relining and new coping stones, all re-bedded on sound, waterproofed substrate.

Leak Detection & Repair

Pressure testing of plumbing, structural crack repair and re-sealing — finding the leak before resurfacing over it.

Plant & Filtration

New pumps, filters, salt chlorinators and pipework to cut running costs and keep the water clear with less effort.

Fix the Leak Before You Resurface

The most expensive mistake in pool renovation is resurfacing a beautiful new finish over an unrepaired structural crack or leaking fitting — within months the leak reappears and the new surface is compromised. We pressure-test the plumbing and inspect the shell first, repair what is failing, and only then resurface. For pools on coastal or sloping sites we also check the surrounding deck and terrace waterproofing, since a leaking pool often takes the deck with it. Pool works pair naturally with our terrace and outdoor renovation.

Resurfacing, Re-Plastering or Retiling: Which One Your Pool Needs

Three different jobs hide behind “redo the pool”. Resurfacing puts a new interior finish — plaster, pebble or a cementitious coating — over a sound, prepared shell. It fixes a rough, chalky or stained surface and is the cheapest route back to clear-looking water, from around IDR 45 million for a standard villa pool. Re-plastering is resurfacing done properly on an old pool: the failed plaster is chipped off back to the concrete, hollow patches are cut out, and the new coat goes onto a clean, keyed shell instead of over the old layer. Retiling replaces the waterline band or the whole mosaic lining, usually with new coping stones — IDR 80–180 million depending on size and tile — and is the right call when tiles are lifting or the look is simply dated.

How we decide: we drain the pool, tap-test the old surface, check the waterline and coping for movement, and run the leak checks described above. A sound shell with a tired surface gets resurfaced; lifting tiles along a whole wall mean a retile; an active leak gets fixed first, whichever finish follows.

Pumps, Filters and Salt Chlorinators: Replacing the Equipment

Many villa pools still run on the pump and sand filter they were built with: noisy, often oversized for the pool and running for hours longer than needed. A plant upgrade — a correctly sized pump, a new filter, a salt chlorinator and re-run pipework where the old runs leak — starts from around IDR 18 million. It is the change guests notice least and owners notice most, in clearer water and lower running costs. We also move plant rooms that flood in the wet season and shade equipment that bakes in the sun.

For rental villas the pool is out of use for 2–4 weeks, mostly curing time before refilling, so we book pool works into gaps in the calendar or the low season and give you the refill date in writing before we start.

Pool Renovation Prices in Bali

A cosmetic resurface of a standard villa pool starts around IDR 45 million; a full retile with new coping runs IDR 80–180 million depending on size and tile choice; structural leak repair and new plant are quoted after inspection. Most pool renovations take 2–4 weeks including curing time before refilling. See the pricing page.

ServiceGuide Price (IDR)Notes
Resurface (standard villa pool)from 45,000,000New plaster / pebble interior on a prepared shell
Full retile & new coping80,000,000 – 180,000,000By size and tile selection
Leak detection & structural repairby inspectionPressure test and crack repair before resurfacing
New plant (pump, filter, chlorinator)from 18,000,000Lower running cost, clearer water

Your pool from IDR 45 M — confirm on WhatsApp

FAQ

How much does it cost to renovate a pool in Bali?
A cosmetic resurface of a standard villa pool starts around IDR 45 million; a full retile with new coping runs IDR 80–180 million depending on size and tiles. Structural and plant work is quoted after a leak inspection.
How do I know if my pool is leaking?
If the water drops more than about 5mm a day beyond what evaporation explains, or your water bill has crept up, it likely is. We pressure-test the plumbing and bucket-test the shell to confirm before any resurfacing.
How long is the pool out of use?
Usually 2–4 weeks. New plaster and waterproofing need to cure properly before refilling — refilling too early is a common cause of early surface failure.
Can you switch my pool to saltwater?
Yes — we fit salt chlorinators as part of a plant upgrade. Many owners find saltwater gentler on skin and cheaper to run than dosing with liquid chlorine in the long term.

Renovation Coverage in Bali

Pool Looking Tired or Leaking?

Send photos of the pool and a note on any water loss — we will tell you whether it is a resurface or a leak repair, and quote it.

Get a Pool Quote